EWGCOG
  • About Us
    • Who We Are
      • EWG Background
      • Board of Directors
      • Executive Advisory Committee
      • Committees
      • Staff Directory
      • Blog
    • What We Do
      • Mission Statement
      • Planning Initiatives
        • Metropolitan Transportation Planning Process
        • Unified Planning Work Program (UPWP)
      • Financial Information
      • Doing Business with EWG
        • Contracting Opportunities
      • Title VI
      • Sunshine Requests
    • Where We Are
  • Transportation Planning
    • Transportation Improvement Program (TIP)
      • Competitive Transportation Programs
    • Long-Range Transportation Planning
    • Roadway Functional Classification
    • Transportation Systems Management and Operations
      • Congestion Management Process
      • Intelligent Transportation System (ITS)
    • Freight
    • Great Streets Initiative
    • Corridor Planning / MetroLink
    • Coordinated Human Services / Section 5310
    • Bicycle and Pedestrian
    • Safety Initiative
    • Infrastructure Investment and Jobs Act (IIJA)
  • Community Planning
    • Community Engagement
    • Environmental
      • Air Quality
        • Pollutants of Concern
        • Air Quality Conformity
        • Ozone Monitoring
        • Committees and Programs
      • Ecological Initiative
      • Water Resources
        • Septic System Information
        • Green Infrastructure / Rainscaping
        • Lower Meramec Watershed Plan
        • Financing Options
    • Hazard Mitigation
    • Local Government Services
      • Outstanding Local Government Achievement Awards – 2022
    • Sustainability Planning
  • Regional Security
  • Research Center
    • Data Center
    • GIS and Maps
    • Where We Stand
    • Reports
  • Calendar
  • Library
Home > Northside-Southside MetroLink Corridor Study – 2018

Northside-Southside MetroLink Corridor Study – 2018

Reports developed during the Northside-Southside Conceptual Design study examining a MetroLink extension in the City of St. Louis.

Existing Conditions Report
Purpose and Need Report
Detailed Definition of Alternatives Report
Engineering Report
Detailed Evaluation of Alternatives Report
Detailed Evaluation of Alternatives - Capital Costs Technical Memorandum
Detailed Evaluation of Alternatives - Operating and Maintenance Costs Technical Memorandum
Detailed Evaluation of Alternatives - Potential Environmenal Impacts Technical Memorandum
Detailed Evaluation of Alternatives - Ridership Technical Memorandum
Detailed Evaluation of Alternatives - Station Area Analysis Technical Memorandum
Detailed Evaluation of Alternatives - Transportation Technical Memorandum
Parking White Paper
Definition and Evaluation of the Cass Avenue Alternative
Station Area Market Analysis
Financial Analysis Report
Summary of Supporting Planning Decisions
New Starts Evaluation Report
Public Engagement Summary
Locally Preferred Alternative Report
Executive Summary
Download All 2018 Northside-Southside MetroLink Corridor Study Documents

Categories:

Reports 2018 Transportation

Share

Stay Connected

Sign Up

Stay Connected



Local Government Briefings OneSTL Where We Stand
Careers Contact Us Directions

East-West Gateway Council of Governments

1 S. Memorial Dr., Suite 1600 St. Louis, MO 63102
Phone: (314) 421.4220 or (618) 274.2750 Fax: (314) 231.6120 Email: webmaster@ewgateway.org

© 2023 East-West Gateway Council of Governments