Surface Transportation Program – Suballocated (STP-S)

The Surface Transportation Program – Suballocated (STP-S) is part of the Competitive Programs that East-West Gateway Council of Governments (EWG) administers.  STP-S projects, like all federally funded transportation projects, are included in the Transportation Improvement Program that EWG develops for the St. Louis region.  STP-S provides flexible funding that may be used by State and local governments for projects to preserve and improve the conditions and performance on any Federal-aid highway, bridge and tunnel projects on any public road, pedestrian and bicycle infrastructure, and transit capital projects, including intercity bus terminals.  This program is funded through the Surface Transportation Block Grant Program which was authorized by the current transportation law the Fixing America’s Surface Transportation (FAST) Act.

Eligible Activities

STP-S funds can be used for projects such as:

  • Roadway resurfacing or reconstruction
  • Bridge replacement, rehabilitation or preventive maintenance plans
  • Bicycle and pedestrian facilities
  • Traffic flow improvements
  • Transit capital projects
  • Highway and transit safety infrastructure improvements and programs, including railway-highway grade crossings

Projects on roads functionally classified as local or rural minor collectors are not eligible for these funds. Bridges on any functionally classified road are eligible for STP-S funds, however, bridges on roads functionally classified as local or rural minor collectors may be replaced with only minimal connecting road work eligible for federal funds. Bicycle and pedestrian facilities may be constructed regardless of the roadway functional classification.  You can visit the Roadway Functional Classification page to view the functional classification maps.

Eligible Sponsors

STP-S funds are available to eligible Illinois and Missouri sponsors in the jurisdictions in the St. Louis region.

East-West Gateway Region Map

 

Eligible applicants include:

  • A municipality
  • A county
  • A state
  • Bi-State Development/Metro
  • Madison County Transit District
  • Great Rivers Greenway

Other agencies, such as not-for-profit organizations, must partner with an entity listed above.

Project Funds

STP-S projects are funded with both federal and local funds at the following levels:

Illinois Projects

  • Up to 75% federal / 25% local funding for:
    • Construction
  • 100% local for:
    • Preliminary engineering
    • Right of way acquisition
    • Construction engineering

 Missouri Projects

  • Up to 80% federal / 20% local funding for:
    • Preliminary engineering
    • Right of way acquisition
    • Construction
    • Construction engineering

STP-S Program Guidance

Project Applications

EWG is not currently accepting applications for STP-S. The next application cycle is tentatively scheduled to begin in early 2018.

There are no upcoming events at this time.

Questions?

Contact EWG staff by phone at (314) 421.4220 or (618) 274.2750 or by email at stps@ewgateway.org.