Purpose:
The Metro South study team has just concluded months of analyzing the detailed alternatives and presented the results
at two open houses. The alternatives were compared to one another using over 40 criteria. These criteria were developed
according to the study’s purpose and need goals: improving access for opportunity, fostering economic development, and
preserving neighborhoods and communities. Another consideration in the evaluation was performance and costs.
In addition to the build alternatives, the study team must consider Transportation System Management (TSM) and
No-Build. The No-Build is those transit and roadway improvements that are already planned for in the region’s
financially-constrained long-range transportation plan. The TSM consists of improvements beyond those in the No-Build
that attempt to serve the purpose and need of the study without building a fixed guideway transit system, such as
light-rail.
The purpose of the two open houses was to present the results of the analysis to the public and get input. Attendees
also had the opportunity to view a virtual reality tour of each alternative and review aerial maps that identified
potential property impacts. The content was the same for each meeting, and included a presentation from the study
team.
If you were unable to attend either one of the meetings, the boards that were shown and the presentation that was
made are available below. You can also view the handouts that were distributed, including the comment form. Please
review the information below, and then use our comment form (PDF) or
email your comments to comments@metrosouthstudy.org.

Station #1: Metro South Study Overview – 08/30/04 (PDF)
Station #2: Detailed Alternatives - 08/30/04 (PDF)
Detailed MetroLink Alternatives
TSM - Transit Improvements
TSM - Roadway Improvements
No-Build - Transit Improvements
No-Build - Roadway Improvements
Station #3: Detailed Analysis Results - 08/30/04 (PDF)
Station #4: MetroLink Stations (Cross Sections and Visual Impacts)
Blue Alternative - Green Park Road
Blue Alternative - Kenrick Townhomes
Blue Alternative - Marlborough
Blue Alternative - Cross Section at Green Park Road
Orange Alternative - Germania
Orange Alternative - Reavis Barracks Station
Purple Alternative - Watson at Mackenzie
Station #5: Virtual Reality Tours (There were no display boards for this station. The
virtual reality tours are not available on the web site.)
Station #6: Next Steps/Public Involvement - 08/30/04 (PDF)

Open House Presentation – 08/30/04 (PDF)

Open House Welcome – 08/30/04 (PDF)
Comment Form – 08/30/04 (PDF)
Detailed Alternatives Evaluation Booklet – (Draft 08/30/04)
Due to the size of this file, it has been separated into two files
Detailed Alternatives Booklet (Draft) - Text pages (PDF)
Detailed Alternatives Booklet (Draft) - Maps (PDF)
PDF files require Adobe Acrobat Reader. Click
here to download a free copy.