|
|
 |
|
|
 |
 |
|
|
|
Topics on this page: Metrolink
|
|
|
|
|
|
|
 |
|
|
|
MetroLink
|
|
Note: For a chronological listing of the Cross-County reports and working papers, go to www.ewgateway.org/corridor/xcorpts/xcorpts.htm
|
|
Title/Description
|
- Cross-County Corridor Major Transportation Investment Analysis, Final MTIA Report
- Summarizes the work performed in Phases 1 and 2 of the St. Louis Cross-County Corridor Major Transportation Investment Analysis and the analysis of the transportation strategies considered, and documents the decisions made by the Study Management Group regarding the strategies recommended to proceed into the next phase of project development in the Cross-County Corridor, Sept. 1997, revised March 1998
|
- Cross-County MetroLink Extension Segment I
- Business Plan (pdf file)
- discusses the specific alignment profile and design features of the MetroLink cross-county corridor project - draft - December 2, 1997 - paper
- Candidate Design Alternatives (pdf file)
- describes a screening process whereby the various concepts have been reviewed and a set of design alternatives are recommended - August 1999 - paper
- Capital Operating and Maintenance Cost Estimation Methodology Draft Technical Report (pdf file)
- Addresses the methodology for estimating the capital, operating and maintenance costs of the planned Cross-County MetroLink Segment I Extension - August 1999 - report
- Community Engagement Process Engagement Strategies (pdf file)
- Includes proposals and strategies for the Cross- County Corridor community engagement process and recommendations for roles and responsibilities of participants in the study, sequence of engagement activities and establishment and composition of a Community Working Group - July 23, 1998 - paper
- Definition of Alternatives
- Explores, in further detail, a set of pre-defined candidate alternatives, taking the form of conceptual design for each alternative - Draft: 02/99; Revision: 03/99; Final: 08/99 - report
- Design Standards and Policies
- Identifies the design standards and policies to be followed for the planning and preliminary design activities for the proposed Cross-County MetroLink Segment I Extension - draft: August 1998; Final: August 1999 - report
|
|
|
|
back to top of page
|
- Evaluation Methodology Final Technical Report (pdf file)
- describes the methodology for evaluating alternative corridor design concepts and outlines proposed technical methods to be used in the Cross-County Corridor MetroLink Extension conceptual design study - August 1999 - report
- Evaluation Results Final Technical Report (pdf file)
- describes the evaluation of the alternative design concepts for the Cross-County MetroLink Extension Segment I Conceptual Design project - Draft: 04/99; Final: 08/99; Revised: 09/99
- Frequently Asked Questions
- Frequently asked questions about design alternatives, funding, public engagement decision-making, and study background of the Cross- County MetroLink Extension Segment I Conceptual Design - last revised 05/08/99
- Final Capital Cost Estimates Report (pdf file)
- describes the draft capital cost estimates for the candidate alternatives developed for the Cross-County MetroLink Extension, Segment I - Draft: 04/99; Final: 08/99; Revised: 09/99
- Financial Analysis Final Technical Report (pdf file)
- examines the financial capacity of the St. Louis region to construct and operate the Cross County MetroLink Extension Phase I - Draft: May 1999; Final: August 1999
- Forest Park Circulator Concepts (pdf file)
- final report discussing possible alternative concepts for the Forest Park circulator in terms of general location and function; Draft: September 1998; Final: August 1999
- Forest Park Circulator Final Technical Report (pdf file)
- a preliminary plan for a transit circulator serving Forest Park & environs - Draft: 02/99; Final: 08/99
|
|
|
|
back to top of page
|
- Preliminary Operations Plan Technical Report (pdf file)
- final technical report, presents a preliminary operations plan for Cross County MetroLink Extension Segment I as applies to the candidate alternatives identified for conceptual design - Draft: 03/99; Final: 08/99; Revised: 09/99
- Public Opinion Survey (pdf file)
- discusses the results of a telephone survey conducted in May of 1998 to test attitudes toward possible MetroLink expansion. The purpose of the survey was to determine the level of support for the extension, to understand why people supported or did not support the extension, and to help planners understand public opinion about various design features - July, 1998
- Situation Assessment for the Community Engagement Process (pdf file)
- Investigates how best to ensure effective community involvement in the definition and testing of conceptual design alternatives for the first extension of MetroLink in the Cross-County Corridor - July 23, 1998
- Socio-Economic and Environmental Analysis Final Technical Report (pdf file)
- presents the socioeconomic and environmental benefits of the conceptual design alternatives for the Cross- County MetroLink Extension Segment I project {this report consists of 7 pdf files but can be downloaded together from a zip file: SE&ERPT.ZIP [file size: 722 kb].} - Draft: 05/99; Final: 08/99
- Socio-Economic and Environmental Methodology Draft Technical Report (pdf file)
- Describes methods for estimating socio-economic and environmental benefits and impacts at a level of detail sufficient to support informed decisions about the conceptual design for the Cross-County MetroLink Extension Segment I project Draft: 12/98; Final: 08/99
- Staff Recommendation on MetroLink Alignment
- Presents staff’s preferred alignment for the Cross-County MetroLink Extension Segment I, Conceptual Design project, September 10, 1997
- Staff Recommendation - Follow-up Information on MetroLink Preferred Alignment (pdf file)
- question and answer format clarifies a number of issues raised by EWGCC Board of Directors after staff issued is MetroLink preferred alignment recommendation - Sept. 16, 1997 - memo to EWGCC Board of Directors
- Staff Recommendation to the Board of Directors (pdf file)
- Explanation and justification of staff recommendations to the Council’s Board of Directors regarding the Cross-County MetroLink Extension Segment I Conceptual Design - June 30, 1999
|
|
|
|
back to top of page
|
- Strategic Alignment Analysis (pdf file)
- discusses the development of information needed for the Board of Directors to authorize the construction of the first operating segment for MetroLink in the Cross-County Corridor - August 15, 1997
- Summary of Phase One Engagement Activities
- Written summaries of the first round of public meetings for the Cross-County Conceptual Design Study, including the date, place and time of meetings, the number of participants, the meeting structure, and the material available to participants for each meeting - September – October 1998
- Survey Sampling Method- ology for Cross-County MetroLink Extension
- explains the ways individuals were selected to participate in the survey and provides information on sampling techniques, Public Opinion Survey - August 14, 1998
- System and Alignment Design Concepts (pdf)
- Describes a series of possible system and alignment design concepts for the Segment I MetroLink extension - August 1999
|
|
 |
|
|
- Daniel Boone Study Area
- Community Engagement Baseline Report
- This report provides information on the community engagement process for the Major Transportation Investment Analysis (MTIA) being conducted in St. Louis for the northside, southside and Daniel Boone study areas. prepared by Howard/Stein-Hudson & Assoc. - March 1999
- Evaluation Methodology - Major Transportation Investment Analysis - 12/99
- A technical report identifying the goals, objectives, and evaluation criteria used in comparing the transportation alternatives that were considered in the Daniel Boone Study Area.
- Existing and Future Conditions Document
- Provides information about existing conditions in the Daniel Boone Study Area for both the recent past as well as projections to the year 2020; prepared by Parson Brinckerhoff Quade & Douglas, Inc.- May 1999
- Purpose and Need Document
- Presents the purpose and need for surface transportation improvements in the Daniel Boone Study Area of the St. Louis metropolitan area; prepared by Parson Brinckerhoff Quade & Douglas, Inc.
|
- General MetroLink Documents
|
|
|
|
back to top of page
|
|
|
- Northside Study Area
- Community Engagement Baseline Report
- This report provides information on the community engagement process for the Major Transportation Investment Analysis (MTIA) being conducted in St. Louis for the northside, southside and Daniel Boone study areas. prepared by Howard/Stein-Hudson & Assoc. - March 1999
- Existing and Future Conditions Document
- Provides information about existing conditions in the Northside Study Area for both the recent past as well as projections to the year 2020; prepared by Parson Brinckerhoff Quade & Douglas, Inc. - May 1999
- Purpose and Need Document
- Presents the purpose and need for surface transportation improvements in the Northside Study Area of the St. Louis metropolitan area
|
- Southside Study Area
- Community Engagement Baseline Report
- This report provides information on the community engagement process for the Major Transportation Investment Analysis (MTIA) being conducted in St. Louis for the northside, southside and Daniel Boone study areas. prepared by Howard/Stein-Hudson & Assoc. - March 1999
- Existing and Future Conditions Document
- Provides information about existing conditions in the Southside Study Area for both the recent past as well as projections to the year 2020; prepared by Parson Brinckerhoff Quade & Douglas, Inc. - May 1999
- Purpose and Need Document
- Presents the purpose and need for surface transportation improvements in the Southside Study Area of the St. Louis metropolitan area
|
|
|
|
back to top of page
|
|
Return to Publications Page
|
|
|
|
 |
|
|
|
|