banner1

On-Line Home of East-West Gateway Council of Governments - St. Louis, Missouri

Search East-West Gateway's Site

 

TabLine-RptsReturn to Library Main Page

Topics on this page: Metrolink/Corridor Studies
 

 

Title/Description

Corridor Studies

  • Cross-County MetroLink Extension Segment I
    • Business Plan (pdf file)
      • discusses the specific alignment profile and design features of the MetroLink cross-county corridor project - draft - December 2, 1997 - paper
    • Candidate Design Alternatives (pdf file)
      • describes a screening process whereby the various concepts have been reviewed and a set of design alternatives are recommended - August 1999 - paper
    • Capital Operating and Maintenance Cost Estimation Methodology Draft Technical Report (pdf file)
      • Addresses the methodology for estimating the capital, operating and maintenance costs of the planned Cross-County MetroLink Segment I Extension - August 1999 - report
    • Cross-County Corridor Major Transportation Investment Analysis,  Final MTIA Report
      • Summarizes the work performed in Phases 1 and 2 of the St. Louis Cross-County Corridor Major Transportation Investment Analysis and the analysis of the transportation strategies considered, and documents the decisions made by the Study Management Group regarding the strategies recommended to proceed into the next phase of project development in the Cross-County Corridor, Sept. 1997, revised  March 1998
    • Community Engagement Process Engagement Strategies (pdf file)
      • Includes proposals and  strategies for the Cross- County Corridor community engagement process and recommendations for roles and responsibilities of  participants in the study,  sequence of engagement activities and establishment and composition of a Community Working Group -  July 23, 1998 - paper
    • Definition of Alternatives
      • Explores, in further detail, a set of pre-defined candidate alternatives, taking the form of conceptual design for each alternative - Draft: 02/99; Revision: 03/99; Final: 08/99 - report
    • Design Standards and Policies
      • Identifies the design standards and policies to be followed for the planning and preliminary design activities for the proposed Cross-County MetroLink Segment I Extension - draft: August 1998; Final: August 1999 - report

 

 

back to top of page

 

 

back to top of page

    • Preliminary Operations Plan Technical Report  (pdf file)
      • final technical report, presents a preliminary operations plan for Cross County MetroLink Extension Segment I as applies to the candidate alternatives identified for conceptual design - Draft: 03/99; Final: 08/99; Revised: 09/99
    • Public Opinion Survey (pdf file)
      • discusses the results of a telephone survey conducted in May of 1998 to test attitudes toward possible MetroLink expansion. The purpose of the survey was to determine the level of support for the extension, to understand why people supported or did not support the extension, and to help planners understand public opinion about various design features - July, 1998
    • Situation Assessment for the Community Engagement Process (pdf file)
      • Investigates how best to ensure effective community involvement in the definition and testing of conceptual design alternatives for the first extension of MetroLink in the Cross-County Corridor - July 23, 1998
    • Socio-Economic and Environmental Analysis Final Technical Report (pdf file)
      • presents the socioeconomic and environmental benefits  of the conceptual design alternatives for the Cross- County MetroLink Extension Segment I project - Final: 08/99
    • Socio-Economic and Environmental Methodology Draft Technical Report (pdf file)
      • Describes methods for estimating socio-economic and environmental benefits and impacts at a level of detail sufficient to support informed decisions about the conceptual design for the Cross-County MetroLink Extension Segment I project  Draft: 12/98; Final: 08/99
    • Staff Recommendation on MetroLink Alignment
      • Presents staff's preferred alignment for the Cross-County MetroLink Extension Segment I, Conceptual Design project, September 10, 1997 
    • Staff Recommendation - Follow-up Information on MetroLink Preferred Alignment (pdf file)
      • question and answer format clarifies a number of issues raised by EWGCC Board of Directors after staff issued is MetroLink preferred alignment recommendation - Sept. 16, 1997 - memo to EWGCC Board of Directors
    • Staff Recommendation to the Board of Directors (pdf file)
      • Explanation and justification of staff recommendations to the Council's Board of Directors regarding the Cross-County MetroLink Extension Segment I  Conceptual Design - June 30, 1999

 

 

back to top of page

    • Strategic Alignment Analysis (pdf file)
      • discusses the development of information needed for the Board of Directors to authorize the construction of the first operating segment for MetroLink in the Cross-County Corridor - August 15, 1997
    • Summary of Phase One    Engagement Activities 
      • Written summaries of the first round of public meetings for the Cross-County Conceptual Design Study, including the date, place and time of meetings, the number of participants, the meeting structure, and the material available to participants for each meeting - September – October 1998
    • System and Alignment Design Concepts (pdf)
      • Describes a series of possible system and alignment design concepts for the Segment I MetroLink extension - August 1999
    • Northside MTIA Study Area
      • Northside Purpose & Need
        • Presents the purpose and need for surface transportation improvements in the Northside Study Area of the St. Louis metropolitan area;  prepared by Parson Brinckerhoff Quade & Douglas, Inc.
      • Northside Existing & Future Conditions Rpt
        • Provides information about existing conditions in the Northside Study Area for both the recent past as well as projections to the year 2020; prepared by Parson Brinckerhoff Quade & Douglas, Inc.- May 1999
      • Evaluation Methodology Report, December 1999
        • A technical report identifying the goals, objectives, and evaluation criteria used in comparing the transportation alternatives that were  considered in the Northside Study Area.
      • Alternatives Development and Screening, December 1999
         
    • Southside MTIA
      • Southside Purpose & Need
        • Presents the purpose and need for surface transportation improvements in the Southside Study Area of the St. Louis metropolitan area;  prepared by Parson Brinckerhoff Quade & Douglas, Inc.
      • Southside Existing and Future Conditions Report
        • Provides information about existing conditions in the Southside Study Area for both the recent past as well as projections to the year 2020; prepared by Parson Brinckerhoff Quade & Douglas, Inc.- May 1999
      • Evaluation Methodology Report
        • A technical report identifying the goals, objectives, and evaluation criteria used in comparing the transportation alternatives that were  considered in the Southside Study Area.
      • Alternatives Development and Screening
         

Return to Publications Page

Previous Page 

Next Page 

Previous Page 

Next Page 

[Home]  [About Us]  [Our Region]  [Calendar]  [Programs/Projects]  [Links]  [Library]  [Site Map]
 

East-West Gateway Council of Governments
One Memorial Dr., Ste 1600
St. Louis, MO  63102
phone:  (314) 421-4220 or (618) 274-2750
fax: (314) 231-6120
e-mail:
webmaster@ewgateway.org

 

last update:  Friday, March 17, 2017